The big empty pad in the first picture is for the utility transformer that will eventually be installed before the site gets energized. The smaller pads behind the 4 northern charging posts are for supercharger cabinets that haven't been installed yet. Current best guess is that they laid in the underground work to support up to an 8 stall expansion (i.e. 4 additional cabinets) for this location at some point in the future.Entire caged area was resealed and lines painted yesterday.
There’s also one equipment pad on the south [east] end of the construction site that has open conduit, and then the four north chargers also have open (but capped?) conduit behind them I’m not an electrical guy so I don’t know what they could be.
View attachment 435055 View attachment 435056