You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Just added. Unsure of where in the plaza this will be located without site plans - dropped a pin w/in the lot which can be moved once actual location becomes known. Also guessed as a 12 stall build initially.
From my understanding, based on Elon, they're focusing on expanding existing locations (probably easier with permitting and existing equipment) but may pull back on new locations (already happened in NY). Not to say there will be no new locations, but based on what I've read thus far, expectations are low.
This is my last nice to have location. Although I would have only used it once in the past 4-5 years. So selfishly (sorry), I feel generally well covered with the existing footprint. I had an important open this spring otherwise I'd feel differently.
Based on an email sent to contractors by Tesla a few days after the firings and reported on the Out of Spec Podcast, Tesla has asked contractors to continue work on locations that they have "started", but to pause on any locations that have not "broken ground". Thats would seem to indicate that the fate of this location in Morehead City is uncertain. (While ones like South Tryon Street in Charlotte and the re-work in Franklin, NC, will be completed.)