Thanks for the picture. Awesome progress! Transformer is on the pad :biggrin:
There seems to be a nasty light pole on the right in front of one of the charging stalls. Hopefully it will get relocated.
I hope this site is operational before April 3rd. I am driving central NJ to Barrie, ON via Paramus, Albany, Utica/Syracuse, Kingston, (Toronto?)
On the way back via Comfort Inn, Niagara Falls, so having to go to Utica from there is 212mile.
Probably fine in a P85, but could be trouble if cold, rain, headwind. Syracuse will give peace of mind.