Prodock
Member
My wife drove by there last week and said she didn’t see any SC activity yet. Still road construction in the area though.Any update on this one? I won’t get to it until late July….
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
My wife drove by there last week and said she didn’t see any SC activity yet. Still road construction in the area though.Any update on this one? I won’t get to it until late July….
There are 8 proposed stalls. 2x 4 stalls on different parts of the property. See site plans again for refI’ve read this thread a few times, but I didn’t notice until today when I created a .jpg of the site plan that it’s dated 2019. The plans proposed Tesla superchargers over 4 years ago. The Dairy Queen and gas station were built, but not the hotel (yet). I found an online article that says the DQ opened January 1, 2021.
Since there haven’t been any photos posted of the actual site I took a drive down I-95 yesterday morning and took a few shots. There’s no way to tell how long ago the power runs were done, but looking at where they pop out of the ground it appears to have been done before Tesla came up with their prefab installs. The plans show four back-in parking spaces along the northern edge of the gas staton’s parking lot, but looking at what’s sticking out of the ground, the space on the end would be a pull-in space for Teslas.
I took a photo from Pembroke Lane showing the vacant space south of the DQ that’s currently being used as tractor trailer parking. Then as I was about to turn left back onto US-13 to head back to I-95, I took a photo of the Dairy Queen and gas station from that perspective.
There are 8 proposed stalls. 2x 4 stalls on different parts of the property. See site plans again for ref
I agree. This is a good location. It would currently be an ideal location for me, but beyond that would be a good spot for I 95 as well as 13/295.It's unfortunate its taking so long
Bummer. I was really hoping they’d get this location up before my son moves this summer.Still no activity going on at this location