After two years(!!!) since initial deposit and contract, Tesla came out today at 7am to install our 6.8kW solar setup. They just left at 9pm and said they ‘still had a number of items on the punch list’ and we would be put back on the schedule, ‘hopefully within a couple weeks’.
Is this normal? The Powerwall team finished their part and were gone by 5 and said the solar would be charging the powerwalls for use before having to wait for inspections and utility signoff but now it seems like it’ll be two weeks (at the most optimistic, but based on experience I wouldn’t be surprised by several months) before the installation is complete.
I’d really hoped this saga was over but I guess it’s back to the phones tomorrow morning…
Is this normal? The Powerwall team finished their part and were gone by 5 and said the solar would be charging the powerwalls for use before having to wait for inspections and utility signoff but now it seems like it’ll be two weeks (at the most optimistic, but based on experience I wouldn’t be surprised by several months) before the installation is complete.
I’d really hoped this saga was over but I guess it’s back to the phones tomorrow morning…