Got the bid $2,400 for 50 amp breaker and 300 foot run. Then Condo Board approval less than two days after turning in my application. I'm thankful everything was went quickly.
Tried to order a HPWC from Tesla. They're on back order 3-4 weeks. My installation was scheduled for May 5 & 6th. I'll call around see is they are available outside of our area. May be installing a NEMA14-50 plug after all.
Tried to order a HPWC from Tesla. They're on back order 3-4 weeks. My installation was scheduled for May 5 & 6th. I'll call around see is they are available outside of our area. May be installing a NEMA14-50 plug after all.