Just curious. Mr.Electric (via contract with Solar City) is installing my 100amp + a NEMA 14-50 line on Monday. As deliveries are starting to be announced, I was wondering if anyone has gotten notification of shipment of their HPC or actually installed one yet.
I'll be fine with my NEMA 14-50 until it comes (glad I considered having that as an option), but will be glad to have the HPC as my main EVSE.
I'll be fine with my NEMA 14-50 until it comes (glad I considered having that as an option), but will be glad to have the HPC as my main EVSE.