jlv1
Twice as much fun
I just realized what caused the switch... and I checked the values in TeslaFi to be sure. The cars switched order in the app just as the Model X (Red RoX) reached more mileage than the Model S. E.g., the car with the higher mileage shows up first.I had an odd problem just happen: my two cars just switched order in the app (Android). The older car was first, and now it's second. I don't know what caused this, or how to reverse it.
Obviously, to restore the order I need to drive The BlueS more.
(another use case for TeslaFi, like those I outlined here and here)
Last edited: