Just had the PW2 installation completed on Tuesday, and have it configured for "Cost Saving". I had been told I would be able to dump PW excess power to the grid during peak periods, by setting the "Reserve for Power Outages", and the "Price Schedule" (Off Peak, Shoulder and Peak). The PWs will fully charge by the start of the peak period, and I'd like to have it dump power to the grid until the it hit the "Reserve for Power Outages" set point.
The best I can achieve is to have house load sourced by the PWs during Peak Period, but, it's limited to the house draw, and none of the PW power will go to the grid. I am in PG&E territory - Is the PW unable to do this, or, is there a way to accomplish?