Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

New hotel construction in CA requires EVSEs

This site may earn commission on affiliate links.
Just a heads up for those interested..

Summary of California’s Updated Building Codes for EV Infrastructure in new construction (effective 1/1/23)

Hotels, Motels, Apartments, Condos with 20 or more units:
  • 40% of parking spaces (10% EV Capable, 25% EV Ready, 5% have EVSEs)
Hotels, Motels, Apartments, Condos with less than 20 units:
  • 35% of parking spaces (10% EV Capable, 25% EV Ready)
Hotels, Motels, Apartments, Condos - Retrofits:
  • If parking facilities are altered and the work requires a building permit, 10% parking spaces added or altered, shall be EV Capable.
EV Capable: A vehicle space with electrical panel space and load capacity to support a 40A 240V branch circuit and necessary raceways to support EV charging. Does not require a circuit breaker, wire or receptacle.

EV Ready: A vehicle space which is provided with a 240V 20A branch circuit; any necessary raceways, to accommodate EV charging, terminating in a receptacle or a charger.