This is pretty strange, as the inspector's notes for the second inspection attempt on Friday indicated that the contractor was not there, cabinets were locked up and the plans were not present. If they are waiting for a part from PG&E, then why keep calling for inspection? And Shirley's comments about the missing part being the only reason for the failure is simply not true