Attachments
Last edited:
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Did you happen to get any pictures?They have started construction. Fence is up and the conduit is getting installed. Supercharger materials are not onsite yet. Looks like 8 spots.
What do you mean by different elevations? Was there a transformer?Everything is set in place. Looks to be all hooked up. Made some asphalt repairs. Some curb repairs were done too. But I don't really understand what they are trying to accomplish with the different elevations. Fence has been removed and they are cleaning up. Still need striping, landscaping, and I assume tesla has to come and do some testing. Sorry, no pictures today.
The curbing in front of the chargers was cut out when they started.. When the re installed it, there are 3 different heights. In some areas it’s flush with the asphalt, some it about 4 inches high, and some is about 8 inches high. It Is very strange to me. Ill get a picture of it tomorrow.What do you mean by different elevations? Was there a transformer?