Thanks for the update!Pour back is complete and concrete contractor is currently floating their work.
Thanks for the update. I assume you mean the transformers, not the individual chargers?Tesla supercharger cabinets installed on newly poured equipment pad.
Wires are now (1/8/23) being pulled from the supercharger cabinets located on the equipment pad to the charging pedestals at each parking stall.Thanks for the update. I assume you mean the transformers, not the individual chargers?
Thanks!Wires are now (1/8/23) being pulled from the supercharger cabinets located on the equipment pad to the charging pedestals at each parking stall.
I didn't see the charging pedestals in the pics. I wonder if they have been delivered to the site. If not, that could delay opening.Site looks ready for the charging pedestals to be installed behind the bollards / Tesla Charging Only signs which offers excellent protection from being bumped and deters ICE’ing.
Install the pedestals and a transformer and it’ll be close.
Yeah…they are off camera in the original shipping cardboard containers.I didn't see the charging pedestals in the pics. I wonder if they have been delivered to the site. If not, that could delay opening.
Post #7 shows them sandwiched between the charging cabinets.I didn't see the charging pedestals in the pics. I wonder if they have been delivered to the site. If not, that could delay opening.
Great, thanks! So hopefully the construction will continue to move along without delay.Post #7 shows them sandwiched between the charging cabinets.
Wiring continues on the "load" side of the transformer to the Supercharger cabinets.1000kVa transformer is on the pad and wiring underway.
thanks for the updates. Hope you're right about the timing.Wiring continues on the "load" side of the transformer to the Supercharger cabinets.
Pedestals are still packaged away in their shipping boxes.
Once those 2 items are complete they will pull the feeders from the utility pole to the transformer.
My guess is they will be online Feb 1 +/- 5days.
I hope that happens quickly. Thanks for the updates.Once those connections are complete, it will be in the utility company's court to get the feeders from the overheads to the transformer.