You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
And so we wait...patientlyUp to Tuesday, the technicians still working on wiring.
I checked the chargers yesterday. They look like finished and waiting for PG&E inspection before go online.
I stopped by tonight. No transformer in sight. Everything else appears to be there and ready.Have you seen any sign of a utility transformer? That's definitely a hard requirement. I looked back in the last couple pages in this thread and didn't see any mention of a transformer or lack thereof. If you don't know what I'm talking about, you can go look at the threads of some other recently-completed Superchargers, many of them have pictures.
Bruce.
Your pictures are of the distribution cabinet and the Supercharger cabinet. Look at the post from the Berkeley thread linked below. There is a concrete pad surrounded by yellow bollards with conduits in the middle. In that post the pad is empty and two posts later you see a big green box in that space. The green thing is the utility transformer.I don't know exactly what a transformer looks like but is this it? I was told by a worker there 2 weeks ago that they are done with everything on their end just waiting on PGNE now.
Your pictures are of the distribution cabinet and the Supercharger cabinet. Look at the post from the Berkeley thread linked below. There is a concrete pad surrounded by yellow bollards with conduits in the middle. In that post the pad is empty and two posts later you see a big green box in that space. The green thing is the utility transformer.
Supercharger - Berkeley (under construction Feb 2020, 16 V3 stalls)