Looks like it should be getting pretty close. Last inspection was on 1/29/18 at which point it looks like the release was given to TECO but still requiring final inspection. Sounds like its TECO's hands now.Anyone know if it is up and running yet?
Date: 1/29/2018 Release To TECO New 1200 Amp 480 Volt 3 Phase Service The WA WA'S Location At 2502 N 50th St. Tampa Florida 33605. Note; Check Available Fault Current Label On Final .