So the Supercharger site is connected to the light pole. Interesting.Cabinets back together. Appears there's still work to be done on the corner by the gas station. Cables just laying there.
View attachment 865770View attachment 865771
Funny but that picture is very old. There has been a connected transformer there for weeks.So the Supercharger site is connected to the light pole. Interesting.
I live in west Chester and this location has been finished without power for at least 5 weeks. I stopped by today and it still doesn’t have power.We’re driving down from Columbus, and visiting some friends in Westchester and hope this is up and running by Thanksgiving!
Thanks for the update! Must be waiting on final inspection from the city/county to satisfy permits.I live in west Chester and this location has been finished without power for at least 5 weeks. I stopped by today and it still doesn’t have power.
Thanks for the update! Must be waiting on final inspection from the city/county to satisfy permits.I live in west Chester and this location has been finished without power for at least 5 weeks. I stopped by today and it still doesn’t have power.
Was this open ?Thanks for the update! Must be waiting on final inspection from the city/county to satisfy permits.
I can’t believe Butler County / West Chester has drug their feet on this so badly.I was there today, still not operational
How do you kinow for certain it is the county holding things up? The same comments are being made on this site about the Beavercreek Supercharger. Anyone today trying to get any construction work done, or hire any contractors, are experiencing massive delays. Why should these superchargers be any different? And, even though the meter has been installed, there still may need tons of paperwork to be completed.I can’t believe Butler County / West Chester has drug their feet on this so badly.
The fact they can’t get it opened 2 months later from their anticipated opening date wreaks of more ineptitude.
Actually there were people convinced this would be ready in October. So yeah the fact we are in late Jan and Tesla’s own timeline was q4 is a huge disappointment. Still can’t believe how they avoided I-75 between Cincinnati and Dayton for this many yearsNow over 4 months since ground-breaking and still not operational. Wow. :-\