craigcabrey
Member
Austin Energy requires a meter on the output of the inverter. That's because we don't have net metering, it's a different system.
Given that the PW+ "announcement" was so vague and lacking in detail, I can only assume that they thought the PW+ inverter was DC coupled with the PW.
Given that the PW+ "announcement" was so vague and lacking in detail, I can only assume that they thought the PW+ inverter was DC coupled with the PW.