Why am I so far behind on firmware? Currently on 2023.7.30. Apparently you need 2023.26 in order to take advantage of Charge on Solar. So far this billing period I’ve sent a little over 250 kWh back to the grid and basically got peanuts for it. 250 kWh would would have charged my M3 SR+ 5 times. They started hyping Charge on Solar 3-4 months ago.