So I have little credit to add WC, so with cable run / bla-bla-bla , it will be around 2k with permit in SiliconValley.
If I decide to add 7kW solar grid-tier, no battery, should I decide now or it will be totally separate run and cost ?
TIA, and mod, if this is not belong here , please move.
EV-
If I decide to add 7kW solar grid-tier, no battery, should I decide now or it will be totally separate run and cost ?
TIA, and mod, if this is not belong here , please move.
EV-