You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I had the same thought, so I swung by Vadnais Heights on Friday and there's no indication of any construction either in the Target lot, nor in the strip mall nearby. I'll dig up that thread and post that information there, too.With the quick action in Bloomington and Maple Grove, I would expect that either Vadnais Heights, Lino Lakes, or Monticello will shortly be next. It would be greedy to think that all 3 will occur soon, but with a Monticello permit popping up very recently, I would expect that one will be next, even though it is the least needed since I-94/I-494 has suddenly gotten supercharger “crowded”. Bloomington helps on the South, but a charger in Lakeville or Faribault would have been much more helpful for the I-35 south route.
With any luck, a supercharger along the North Shore would really be great, and one along 61 to the southeast, maybe in Red Wing or Winona.
Umm… We have already been actively covering this one since May 5th.New Superchargers currently being installed at Target in Maple Grove.
Have you tried calling Tesla at (877) 798-3752 to ask about it?Looks like Hinkley is offline (for the last 3 days or so). Anyone heard any updates or news on this one?
No. Past experience calling usually results in a very polite Tesla tech with a very generic answer to the issue and its eventual resolution.Have you tried calling Tesla at (877) 798-3752 to ask about it?
Hmmm I've always had very knowledgeable employees when I've called who have been able to pull up diagnostics on the Supercharger & tell me specifically what the issue is.No. Past experience calling usually results in a very polite Tesla tech with a very generic answer to the issue and its eventual resolution.
I am not even traveling right now, but I do sometimes use this route to/from Duluth so I was curious how serous and lengthly the issue is (for future reference). And I was surprised to not to see more complaints/concerns, but oddly there is no discussion thread for the Hinkley supercharger, and “boots on the ground” often have more direct info relevant to the issue. I guess this location is less critical now that Carlton and North Branch have superchargers. Well, unless you like to roll in to every charger with 2% SOC in order to get a maximum charging rate.
That’s Tesla-specific equipment. Is that 585 Northtown Dr NE, Blaine, MN 55434? Perhaps tag @corywright for an update.This showed up in the MN Tesla FB feed today:
View attachment 866688
Who knows how to do a permit search?
If we can get confirmation of the location and address then we'll add it.That’s Tesla-specific equipment. Is that 585 Northtown Dr NE, Blaine, MN 55434? Perhaps tag @corywright for an update.
Faribault would be perfect especially at the West Mall, HY-Vee, or SuperAmerica(TruckStop). There is currently only 1 Level 2 charger in downtown. Please vote in the Other locations needed for Faribo.Definitely agree about the need for an option about halfway between Minneapolis & Albert Lea.