Hello All,
First time posting here, so please bear with me….
Wanted to know if anyone from NorCal - Sacramento wait times on Tesla Solar Panel + 3 Powerwall are. Its unfortunate that SMUD (Utility provider) doesn’t allow more than 110% of last 12 months…..CPUC 3.0 doesn’t apply for this community owned provider and they have their own NEM 2.0 rules.
Appreciate any feedback on wait times, i did get a response from the Tesla Project Advisor ….still in design and finalizing stage. Have an existing Solar 5.7 MW (13 panels) already in place from the new home builder in 2019. Having talked to SMUD, they said in writing that i am allowed 6.2 KWH system which I have let the project advisor know.
I know timelines and supply chain issues, just curious if anyone has overall feedback on the system, timelines and wait in NorCal along with their experiences.
Place initial order for system directly from Tesla on 11/15, SMUD confirmed they haven’t received any applications from Tesla being submitted.
First time posting here, so please bear with me….
Wanted to know if anyone from NorCal - Sacramento wait times on Tesla Solar Panel + 3 Powerwall are. Its unfortunate that SMUD (Utility provider) doesn’t allow more than 110% of last 12 months…..CPUC 3.0 doesn’t apply for this community owned provider and they have their own NEM 2.0 rules.
Appreciate any feedback on wait times, i did get a response from the Tesla Project Advisor ….still in design and finalizing stage. Have an existing Solar 5.7 MW (13 panels) already in place from the new home builder in 2019. Having talked to SMUD, they said in writing that i am allowed 6.2 KWH system which I have let the project advisor know.
I know timelines and supply chain issues, just curious if anyone has overall feedback on the system, timelines and wait in NorCal along with their experiences.
Place initial order for system directly from Tesla on 11/15, SMUD confirmed they haven’t received any applications from Tesla being submitted.