I did a search and found that a 10 stall supercharger station received planning approval on April 30, 2018. The description is:
The corresponding construction permit BL-2018-0167 was approved on September 19th and issued October 1st so it should be under construction. The address is 1618 Redwood Highway. Tesla already has a store and 6 HPWCs in the mall.
Add 10 Tesla Vehicle supercharging stations between the western wall of the Village at Corte Madera Center and the western parking lot that runs parallel to Highway 101. The new charging stations will be located south of the existing charging stations. The existing jagged wall will be replaced with a straight wall screening the new mechanical equipment. The plan shows a 4 foot path between the proposed charging units and the area landscaping for pedestrian and wheelchair
clearance as well as accessible parking spaces. New landscaping will also be installed to screen the proposed CMU wall.
The corresponding construction permit BL-2018-0167 was approved on September 19th and issued October 1st so it should be under construction. The address is 1618 Redwood Highway. Tesla already has a store and 6 HPWCs in the mall.