Here are a few site photos. No meter but no try supercharger and c-store transients in, missing the switchgear/site controller. Primaries appear connected. Busy site - lots of work underway.
Thanks for the great photos. Speaking of busy, that pole looks wildly busy - two 3 phase high voltage connections and 5 cable TV/telecom cables (running on both sides). Was particularly amused by the lower brace cable threaded between the two conduits. Replacing this pole (at this slight bend) when the time comes will be interesting.