You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
The chargers are open now. I saw them while stopping at sheetz. This is a very good location for me. Right between home and work! There were about 10 stalls in total i believe. I did not get them all in this pic.
Cool. I’ll check it out when I’m up there Tuesday. On the 8th no utility work had been done. The utility lines run just south of the building. There is a pole right behind the building near where the charger cabinets will be. So, it’ll be pretty obvious if they’ve worked on that.
2 charger cabinets, but no switching gear or transformer yet. Obviously no numbers on the stalls. The covers on the cabinets say Tesla Energy.View attachment 620258
The public side work is done. It's the utility side transformer that is missing. The meter can is on the rack. If we had a shot 90 degrees to this one I could tell more. I think there just waiting on Dominion at this point.
I'm pretty sure those are V3 cabinets. I think they all say Tesla Energy.