Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Las Vegas, NV - West Craig Road

This site may earn commission on affiliate links.

Matsayz

Active Member
Jul 6, 2019
1,419
1,301
Las Vegas
A member on the local FB group found this. I stopped by today for pictures and to confirm it was a Supercharger. Haven’t seen a permit yet but we do have construction proceeding quickly.

Craig Marketplace, Tenaya Way & Craig, NW-ish side of town. 5 cabinets, V3, very very long run to where the transformer will be.

@Big Earl @Chuq @corywright
 

Attachments

  • IMG_8795.jpeg
    IMG_8795.jpeg
    502.3 KB · Views: 261
  • IMG_8805.jpeg
    IMG_8805.jpeg
    568.6 KB · Views: 109
  • IMG_8804.jpeg
    IMG_8804.jpeg
    618.4 KB · Views: 108
  • IMG_8803.jpeg
    IMG_8803.jpeg
    642.8 KB · Views: 106
  • IMG_8802.jpeg
    IMG_8802.jpeg
    727.9 KB · Views: 112
  • IMG_8800.jpeg
    IMG_8800.jpeg
    279.2 KB · Views: 121
  • IMG_8799.jpeg
    IMG_8799.jpeg
    400.9 KB · Views: 113
  • IMG_8798.jpeg
    IMG_8798.jpeg
    501.6 KB · Views: 122
  • IMG_8797.jpeg
    IMG_8797.jpeg
    452.1 KB · Views: 124
  • IMG_8796.jpeg
    IMG_8796.jpeg
    567.1 KB · Views: 119
5 cabinets and V3 - does that mean 20 stalls?

Yes, though I did find a permit to verify that.

Vegas permit search was a pain - have to provide the exact address, and at 7121 W Craig there are multiple suite numbers and then no suite number.

Permit & Application Status

search by "address" (default)
street number: 7121 (kudos to Matsayz for the pic of the shipping labels)
street name: Craig
street direction: W
then "(search)"
one gets a popup with 5 choices, choose "(next)" twice.
select the one on the last panel without a suite number.
This brings up a list of permits, the most recent (at top of list) was applied for 4/21/2023

C23-01355 - Commercial Building Permit (Com)​

"
Permit Issued: 8/3/2023
Expiration Date: 1/30/2024
Scope of Work: INSTALL (5) TESLA SUPERCHARGER CABINETS · INSTALL (20) TESLA CHARGING POSTS · INSTALL (1) 2500A, 277/480V SWITCHGEAR · INSTALL (1) UTILITY TRANSFORMER FOUNDATION · INSTALL (1) UTILITY PULL-BOX · INSTALL (1) DUAL-HEADED PEDESTRIAN LIGHT FIXTURE"
 

Attachments

  • C23-01355-InspectionCard.pdf
    106.7 KB · Views: 68
Yes, though I did find a permit to verify that.

Vegas permit search was a pain - have to provide the exact address, and at 7121 W Craig there are multiple suite numbers and then no suite number.

Permit & Application Status

search by "address" (default)
street number: 7121 (kudos to Matsayz for the pic of the shipping labels)
street name: Craig
street direction: W
then "(search)"
one gets a popup with 5 choices, choose "(next)" twice.
select the one on the last panel without a suite number.
This brings up a list of permits, the most recent (at top of list) was applied for 4/21/2023

C23-01355 - Commercial Building Permit (Com)​

"
Permit Issued: 8/3/2023
Expiration Date: 1/30/2024
Scope of Work: INSTALL (5) TESLA SUPERCHARGER CABINETS · INSTALL (20) TESLA CHARGING POSTS · INSTALL (1) 2500A, 277/480V SWITCHGEAR · INSTALL (1) UTILITY TRANSFORMER FOUNDATION · INSTALL (1) UTILITY PULL-BOX · INSTALL (1) DUAL-HEADED PEDESTRIAN LIGHT FIXTURE"
Glad you found it, I tried the same street info but didn’t click all the suites… now I know. Odd that it didn’t come up in a search under “Tesla” though, these permit sites are rough to say the least.

Quick turn, 3 Aug and heavily into construction 12 Sept!
 
Glad you found it, I tried the same street info but didn’t click all the suites… now I know. Odd that it didn’t come up in a search under “Tesla” though, these permit sites are rough to say the least.

Quick turn, 3 Aug and heavily into construction 12 Sept!
Finally figured out the direct link to permit.
"rough to say the least" indeed you got that right.

Yeah they're flying, already today have partial passed underground electrical.
Scroll down and "(click to open)" inspection status on permit page.
 
  • Informative
Reactions: Matsayz
I stopped by here today to check out how things are going. The pedestals are up but they still have a little concrete work and asphalt to do. Unfortunately, no Magic Docks on these. Now that those installs seem to be pickup up speed, I was hoping for a local Magic Dock station to try out my Chevy Spark EV on one.

IMG_20230929_155741661_HDR.jpg
 
  • Like
Reactions: Matsayz
Super excited for this one to come online!! This is my local grocery store lot that I frequently visit. Was super shocked and excited to see the construction of these underway last month during a grocery run when I realized what was going on.

Just got another Model S Plaid in July after Tesla repurchased my 2021 and it came with 3yrs of free supercharging, so you will see me here very frequently :D
 
  • Like
Reactions: Matsayz
Ok well I literally had to go back to the grocery store to pick up some things I forgot and as I arrived there was a Tesla Energy truck parked and a guy flipping the switch to turn them on.

On my way out the Tesla energy guy stopped me and said they literally just turned them on and I was the first to use them. They should show up in the app within 24-48 hours from now.