Per reports from @j.gardiner.201, a V4 supercharger is under construction at the Coco Key Resort in Mt. Laurel Township, NJ. Looking at dig tickets, one was filed in January at that address to install conduit. Tesla is not named but it fits the reports. Hopefully someone can post pictures of construction here to verify.
@Big Earl @Guacahummus @corywright
 
Damn this is huge

39 chargers

Two transformer pads. Neither poured yet.

All stalls and cabinets on site.

C898DEBA-2AD6-482E-8403-0C8F6DA57101.jpeg


4B45B157-4387-4CEC-99EC-4DBD6737F91C.jpeg


0D88C86A-9E94-40BE-AD07-1869473A5C93.jpeg
 
Thanks for the photos and update. Much larger than we thought! 39 stalls seems like an odd number (ie. would expect 40 to align with 4:1 post to supercharger ratio). The charging posts appear to occupy most if not all perimeter spots along the side of the hotel facing RT-73 and the back perimeter of the lot adjacent to the on ramp to I-295.

Will be interesting to see a few more site photos in the daytime.
 
Yes every spot facing 295 has a stall
However not all the spots facing 73. Also from what I could tell one of the spots will be ADA which is not the case today so perhaps that’s where the odd number is from or maybe I didn’t count right.

PSE&G was working on the pole last night too.