Wires not unspooled yet on second look. They may be done for the weekend at 1 PM Saturday.
View attachment 735360View attachment 735361View attachment 735363View attachment 735364View attachment 735365View attachment 735366View attachment 735367
Corrected - my mistake. Sorry for the false alarm - it was "nearby" Malta. I got confused....
@tes-s @MarcoRP @corywright I think a correction to supercharge.info is in order - North Conway can't be open with the update from Saturday above.
Ah... Malta. I can understand the error. Thanks!Corrected - my mistake. Sorry for the false alarm - it was "nearby" Malta. I got confused....
Do you have any updates on the N. Conway SC since June? CheersThe community wisdom is that it's eventually going to go at the Irving Oil / Circle K gas station in North Conway (1500 White Mountain Hwy). This is based on a presentation from Irving in summer 2019 listing it as a proposed location that they were in discussions with Tesla about (originally mentioned here. I don't think anyone has heard anything about it since though.
View attachment 675154
Yes, it would take a miracle akin to virgin birth for this to be ready for Xmas. Even MLK day is optimistic. Presidents' day might be more realistic. Two photos from today. No one onsite at 10:30 am.Feels like they are cutting it close for the Christmas travelers. They've already missed the Thanksgiving crowds.
Thanks for the pictures and update, looking forward to charging here!Yes, it would take a miracle akin to virgin birth for this to be ready for Xmas. Even MLK day is optimistic. Presidents' day might be more realistic. Two photos from today. No one onsite at 10:30 am.
View attachment 738995
View attachment 738996
The Littleton, MA SC went from ground breaking to charging in about 2 months, so 'operational by Christmas' is possible (work here started early October). However, Littleton has it's own electricity supplier, not one of the big utilities. From what I've seen, delays in the utility coming in, signing off, and turning on the juice are a major factor in the time it takes to activate an SC.Yes, it would take a miracle akin to virgin birth for this to be ready for Xmas. Even MLK day is optimistic. Presidents' day might be more realistic. Two photos from today. No one onsite at 10:30 am.
My prediction is that this SC will complete within a week or so
Took less than a week for both Eversource and Conway to inspect/approve a residential solar install with Powerwalls, although I'm guessing the SC is slightly more involved and Hannaford may be NHEC territory.It's already 2 months since they started dropping hardware at the site. I'm sure the utility up there has people that can do inspections pretty quick, and I'm sure the town has inspectors that can approve the site quickly too. It just looks like slow construction progress for whatever reason.
Progress! Thanks for the continued on-location reports.It seems much of the work this week is to install a curb between the pedestals and the parking lot. The non Tesla spots bordering the grass/wood chips on that side of the lot do not have a curb, so it's a bit odd.