Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - San Jose, CA - W Capitol Expy (under construction Mar 2024, 12 V3 stalls)

This site may earn commission on affiliate links.
Drove by this morning. Active construction was underway, with several people with PG&E vests. Today it looked like they had just poured concrete for a utility pad and were pouring concrete for redoing the sidewalk that was cut into to make the PG&E connection, plus possibly other things I could not see. The power trench was clearly notched out on the asphalt on the side of Vistapark next to where they were pouring concrete.

IMG_2426.jpeg
IMG_2425.jpeg
 
  • Like
Reactions: Shirt4878