Cryptoengineer
Member
I followed the Littleton and Lexington SC construction closely. This looked very similar. The excavation is far too small for the (5-6 foot diameter) sewer pipes, which are still onsite, and the work is in the exact spot we expected the SC to be. However, there was no Tesla branded material visible.Thanks for the update.
Is there anything that confirms this is a Tesla Supercharger project? There was a report of a large sewer pipe nearby so any chance this is related to that?