Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Walnut Creek, CA - Oak Grove Road (LIVE 2 Jun 2023, 12 V3 stalls)

This site may earn commission on affiliate links.
That's great, if someone can post a photo here showing something that's clearly Supercharger-related (anything with a Tesla logo would suffice, or pedestal bases, which have a distinctive shape), we can update the thread title here on TMC and also ask the supercharge.info editors to update the state there as well.

Bruce.
 
@bmah - here's link to to Facebook post and a photo posted by Mark Munn on Facebook. It's an area shot, but the shapes clearly look like they are the pedestals and all in place and you can see what look like the three V3 cabinets sitting on the left side. He also references in a comment about it being located at/near a Panda Express that shows to be right by the address shown in the permit referenced in this thread.

Facebook post: Log into Facebook

One of the two included photos.
1673305682528.png
 
@bmah - here's link to to Facebook post and a photo posted by Mark Munn on Facebook. It's an area shot, but the shapes clearly look like they are the pedestals and all in place and you can see what look like the three V3 cabinets sitting on the left side. He also references in a comment about it being located at/near a Panda Express that shows to be right by the address shown in the permit referenced in this thread.

Facebook post: Log into Facebook

One of the two included photos.
View attachment 894036

Works for me, thanks!

Bruce.
 
I'm guessing there hasn't been a lot of change since the last picture, but here's a few more views including a space where the transformer pad will probably go (someday). Pedestals, charger cabinets, switch gear, paving, striping, signage, lighting all look to be done, just need that big green utility transformer. Eight pedestals are bagged, the uncovered ones are standard V3s (unsurprisingly no Magic Docks). I like the recycling and refuse containers, hopefully owners will use them (correctly).

Bruce.

1677955781855.jpeg
1677955812960.jpeg
1677955828237.jpeg
 
Any idea when this station will go active? Seems like it's been in an idle state ever since the construction completed. Would be great to charge here since currently there are only 2 non-Tesla chargers in this lot and they're almost always occupied.
 
Work is done on getting power to the site. They are digging quite long tranches across the street to newish shopping center to tap into the juice.
 

Attachments

  • 2023-05-02 13.17.13.jpg
    2023-05-02 13.17.13.jpg
    456.6 KB · Views: 60
  • 2023-05-02 13.16.08.jpg
    2023-05-02 13.16.08.jpg
    673.1 KB · Views: 69
  • Informative
Reactions: bmah
Trench work on Citrus looked completed. No transformer yet. Also looks like there some work to be done tying into the overhead power lines at the main intersection where the trenchwork terminates.

Screenshot_20230521_142959_Gallery.jpg
 

Attachments

  • 20230521_102032.jpg
    20230521_102032.jpg
    338.9 KB · Views: 47
  • 20230521_102043.jpg
    20230521_102043.jpg
    517.1 KB · Views: 64
  • Like
Reactions: Guacahummus
Went over here this morning to take a look. Not much to see other than what @chowsn posted in the pictures above, although the transformer was gently humming, which I guess is a good sign. At the very least, someone from Tesla is going to have to come out here and take the covers off the charger cabinets plus 8 of the posts.

Bruce.
 
  • Like
Reactions: Limited