As soon as I found out I can save 9K by downgrading the software on my 75D, I did it.
So now the question is...
If I'm limited to 60KW of the 75 available does that mean I can charge it to 100 percent without worry about degrading the battery?
Thanks!
So now the question is...
If I'm limited to 60KW of the 75 available does that mean I can charge it to 100 percent without worry about degrading the battery?
Thanks!