I agree - Q1 2024 is my estimate. (I think that is what you meant)I´m not Mr. M, but it looks like theres no Model 3 Highland for GB in Q4 Perhaps in the early Q1/25, there is a chance ... just my 2
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I agree - Q1 2024 is my estimate. (I think that is what you meant)I´m not Mr. M, but it looks like theres no Model 3 Highland for GB in Q4 Perhaps in the early Q1/25, there is a chance ... just my 2
Thank you, but it's the old Model 3 I was referring to..
I had a good look at my records and what is arriving in Southampton on 9 Oct and can categorically say nothing with Teslas onboard is arriving then or anytime soon.Nothing on my radar. They don't make 'classic' Model 3s anymore - GLOVIS COSMOS is unloading the last of them at Southampton now.
I've just had a look at my list of Shanghai departures and nothing is leaping out at me - I'll take a closer look tomorrow but I very much doubt there is another ship.
Not quite.It seems ASIAN CAPTAIN has a delay. Initial arrival date in SUEZ was 15 october at 18:00. Now I see will arrive at 17 october
I had a good look at my records and what is arriving in Southampton on 9 Oct and can categorically say nothing with Teslas onboard is arriving then or anytime soon.
I just noticed Glovis Cosmos had her next destination updated to Sheerness, ETA 9th October!Only wild card I have spotted is Garnet Ace, left Shanghai Sept 4th. Currently heading to Antwerp from Barcelona. Maybe that will head to Southampton after its mainland Europe stuff. Total and utter wild card though.
2nd Scenario is that Tesla aren't being straight with you and it is on Glovis Cosmos.
so i am in the same boat, no vin and in red with white interior means there doesn't seem to be a lot of choice.I just noticed Glovis Cosmos had her next destination updated to Sheerness, ETA 9th October!
Mostly wishful thinking on my part as still no VIN assigned and reality of my order not being fulfilled slowly sinking in..
Typhoon Koinu is crossing Taiwan and RCC ANTWERP has started to move south to pass to the east of Taiwan and behind the typhoon.
Interestingly a number of cargo vessels (no car carriers) have been caught by the typhoon in the Straits of Taiwan (which can be rough in the best of times!).
The typhoon's strength has dropped as expected but it is still a category 2 storm with 105mph winds
as mentioned the tracker adapts to the speed and course of the vessel and therefore will show a later date if it travels slower or around land etc.Crystal Ray has now ETA of 24th Oct. to ZEBRUGGE in the Tesla Tracker website.
On the marine traffic website or app it says 17th, whats more accurate?
Oh yeah right, sorry and thank you, I forgot about thatas mentioned the tracker adapts to the speed and course of the vessel and therefore will show a later date if it travels slower or around land etc.
Your car may not be loaded yet....I have vin but he doesn't find cargo. Why?
I have delivery between 19/10 and 2/11. I already have the Vin and paid. I think there is something wrong. Try to check. Thanks.Your car may not be loaded yet....
The VIN check only works with Höegh Autoliner and their ships like HOEGH TROOPER (she is carrying MS and MX)I have delivery between 19/10 and 2/11. I already have the Vin and paid. I think there is something wrong. Try to check. Thanks.
Thanks!!! I didn't understandThe VIN check only works with Höegh Autoliner and their ships like HOEGH TROOPER (she is carrying MS and MX)
It doesn’t work with the other carriers (that are carrying the M3)