I have 2 PW. Debating on adding 1 or 2 more or alternatively replacing HVAC that is double SEER as 2 PW can barely squeak by during peak hours with HVAC running and can't power the house with both compressors running at the same time - draw is higher than 10kW.
Has anyone recently ordered 3-4 PW in SDG&E territory? When I ordered my 2 in 2020, SDG&E still required NGOM meter for any set up with more than 10kW ESS, but I believe this changed afterwards. Adding one may not be worth the effort, but adding 2 to total 4 would give me 20kW with total storage of 54kwh. Curious if there's new limitations on this side of ESS in this area.
Has anyone recently ordered 3-4 PW in SDG&E territory? When I ordered my 2 in 2020, SDG&E still required NGOM meter for any set up with more than 10kW ESS, but I believe this changed afterwards. Adding one may not be worth the effort, but adding 2 to total 4 would give me 20kW with total storage of 54kwh. Curious if there's new limitations on this side of ESS in this area.