Solarman004
Member
You beat me to it. Also drove by this morning. The exterior is "Tesla gray". A crew on a lift was working on building face above the main doors, possibly prepping for sign installation as MorrisonHiker stated.Things are very busy here today. Looks like the exterior painting is done. They are putting up metal framing for interior walls. Looks like sign guys are there and signs will be installed soon. Still pretty empty in the Service Center part. Still lots of work to do.
View attachment 588803 View attachment 588804 View attachment 588805
I'm really looking forward to not making the drive to Denver.