Once to Santana Row on 8/3 of this year. I should have put down my deposit then. I'd have my P85 by now! But alas, I didn't reserve until Christmas, so am US P#16743, with realistically at least 5 months to wait, depending on production rates, when they start finalizing European production reservations, and when the production line(s) starts doing 40kWh, standard suspension, and (new) red paint.