2 trucks in driveway - one with Powerwalls and other the panels team. Total 6 folks - 2 electricians + 4 panel installers
View media item 121827
Guys on roof setting up whatever needs to be setup before panels are moved up.
View media item 121831
Soda + water drenched in ice.
View media item 121828
Side of house where everything would be setup
View media item 121832
View media item 121827
Guys on roof setting up whatever needs to be setup before panels are moved up.
View media item 121831
Soda + water drenched in ice.
View media item 121828
Side of house where everything would be setup
View media item 121832