When did you order?Got it. I’m still early in the process but they are coming out this week for the site survey. I’m assuming he’ll be asking where the pw’s and other equipment will be installed?
My main panel and meter is in a crowded area with the garage entry door, ac compressors and water treatment systems on the outside and the air handlers and a small alcove on the inside which is the garage area. I thinks it’s going to take some considerable conduit runs to get from the main panel to some open space for all the new equipment.