Thanks for the new picture. It looks like all that is left are the GA Power turn on (but that could already be done), any legally required inspections (which also could be complete), and Tesla's own outside agency inspection for liability purposes, and the actual Tesla tech to finally turn it on for good (we hope). It was at this point that Indio CA got stuck for months for reasons I never discovered. Let's hope that does not happen here.
If anyone hears anything about an opening date, please post. It could be as soon as the coming week. For soon-to-be Tesla owners following this, you can tell if the stalls are powered up by whether or not the TESLA name at the top is illuminated.
Is Tesla still doing opening events?
Has anyone tried the Veracruz Mexican Restaurant?
scoots