Any idea on the permitting progress for the Supercharger? Anyone been to the site?
Anyone have good charging suggestions for Charlotte around Thanksgiving?
West, John C. Commercial Electrical 1 Re-review Pending Pending Resubmittal 11/14/201
LUESA Commercial -- Commercial Electrical Review Notes:
Cycle 1 Noted on 11/14/2014
Project #349165 Job-Tesla Motors Supercharging Station Date-11/14/14 Electrical Examiner; John West 704-432-4647 Electrical Engineer; Sheet Comment All Elec. 1) Show manufacture specifications on light pole and fixture. 2) Show Temperature terminations per NEC 110.14C(1). 3) Show service and feeder load calculations per NEC 220. 4) Need manufacture specifications and installation instructions on super charging stations and charging pedestals. 5) Need manufacture specifications and listing on communication cable. 6) Show the available fault current from the utility co. 7) Show a note for NC approved third party listing and label on all materials and equipment. 8) Show AIC rating for the super charger. 9) The Equipment ground in the super charger feeder must be increased per NEC 250.122(B). 10) Remove the grounded conductor from the feeder to the 7.5 transformer from its source, and install a grounded conductor from the transformer secondary to the panel. The #6 from the switchgear needs to be installed per NEC 250.32(2)(A) not 250.30. Show sec. feeder size and prim. feeder size to and from transformer. Redraw transformer diagram for clarity.
That was my first thought as well! Plus there are 4 Superchargers in NC already, he is referencing NC laws, wonder how the other 4 got approved!?Very similar plans have already passed review in over 125 locations nation-wide
Plus there are 4 Superchargers in NC already, he is referencing NC laws, wonder how the other 4 got approved!?
And Sagamore has absolutely NOTHING on Greenville, SC. It has been months and as far as anyone can tell it is still hung!This would give the GC some good leverage against the obsessive inspector if needed. Let's hope this site doesn't turn into a sagamore MD! That site was held up for a couple months by an unreasonable inspector.
And Sagamore has absolutely NOTHING on Greenville, SC. It has been months and as far as anyone can tell it is still hung!
It is a little easier if you are constructing it on property you already own.Would love to see Commerce up and running soon. When Tesla wants a SC opened quickly, they can do it. Decatur GA showroom to have two or three stalls open very soon and no mention of it on the Supercharger map just a month ago
The plan review isn't even complete, let alone the permitting. You won't see anything probably until mid-December if that.Went by on the way home tonight just to see if any equipment had shown up yet. It hadn't.
The plan review isn't even complete, let alone the permitting. You won't see anything probably until mid-December if that.