Of course they do. They have to.Everyone charges at home in south Surrey lol. Seriously thou it’s got to be the highest per capita in all of Canada
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Of course they do. They have to.Everyone charges at home in south Surrey lol. Seriously thou it’s got to be the highest per capita in all of Canada
Can confirm, we have 2 chargers, and room for another oneEveryone charges at home in south Surrey lol. Seriously thou it’s got to be the highest per capita in all of Canada
So where’s South Surrey lmao
Bro don't get me started...
I was promised South Surrey/ White Rock back in 2017...
Now it is basically done 2021... And I was told it's delayed again until mid -2022
Where? Either Semiahmoo mall, Grandview corners, or Peninsula Village.
Everyone charges at home in south Surrey lol. Seriously thou it’s got to be the highest per capita in all of Canada
Took these pics on my way home last night. 12 v3 stalls (confirmed with 3 cabinets in the 2nd pic). No transformer on site yet. It's hard to tell because it was so dark, but that is the empty transformer pad on the right on the 2nd pic.
No, this was a separate trip. Transcanada trip was August 12th-22nd. Spent the last 5 days driving roughly Seattle-Saskatoon-Prince George-Seattle. I'll probably stay south of the border until spring now. The lakes and even some of the rivers were already frozen over in Alberta and Saskatchewan.@PLUS EV are you still in Canada from your cross-country road trip?
This was taken today. No power yet but 12 250 kW stalls.
I was there last night. Superchargers are still not powered on. There are 4 FLO level 2 chargers at the front of save on foods.Are there any Flo fast chargers at this location as well, or just Superchargers?
They were not lit up on Dec. 14th.still no power?
Any new updates on Chilliwack? It's been a while.
Whoever goes there, please check to see if the transformers are installed and check if there is a BC Hydro meter as well. Photos would be great.