M
MarcoRP
Guest
New Supercharger coming to Frederick at the Sheetz on Buckeystown Pike. A remodel was recently completed on the Sheetz, and the Superchargers will be built behind the store.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Interesting, every time I use it there are very few people there. Well if the underground feeder they ran isn't large enough to handle an expansion they can simply move closer to the source. Richmond has two sites facing each other. one V2 and the other V3, unless they have upgraded.OG Frederick is V2 and usually almost full
Yeah, I live a couple miles away and cut through there daily and never see more then about 4 cars there. Guess their building for the future.Interesting, every time I use it there are very few people there. Well if the underground feeder they ran isn't large enough to handle an expansion they can simply move closer to the source. Richmond has two sites facing each other. one V2 and the other V3, unless they have upgraded.
No rush here.
The Orange machine is a wire puller. A bulk of the time you see the guys pull the feeders in with a backhoe or a Skid steer. Someone properly doing there job for once.I stopped by the new Frederick location today. It looked like they're installing wiring and setting up the main electrical cabinets.
The second picture shows the main cabinets, I'm curious about the orange machine on wheels. Looks like it's somehow used for running the cabling through the conduits?
There are no missing pedestals. I count 8 from pictures earlier in the thread.I stopped by this location today. Fencing is gone. Site is missing two charging stations (at the far end nearest to the charging cabinets).
View attachment 760923
View attachment 760924
There are no missing pedestals. I count 8 from pictures earlier in the thread.