I see digging being done at the wall of the store.
It looks like they are not using those concrete pads and conduits anymore (from 2019) and actually building a little farther away.
Plus, I don't think those concrete pads and conduits (from 2019) are designed for V3s at all, and are more suited for V2.
Hopefully, more photos posted soon.