Supercharger - Mission Viejo, CA - Crown Valley Parkway (LIVE 23 Dec 2021, 8 urban stalls, expansion in progress)

This site may earn commission on affiliate links.
It's official. I and others are charging here. This is a great location now that I know where it is. It's in the parking garage on level P2, which was lower than P1.
IMG_20211224_081350.jpg
IMG_20211224_081226.jpg
IMG_20211224_080304.jpg
IMG_20211224_081518.jpg
IMG_20211224_081216.jpg


Edit- oops can a mod fix the year above to 2021? Thanks ☺️
 
I still don't see this site on the Find Us map. Could that be an indication it is temporary? I'm not sure why they wouldn't keep it here. It is a great location and will help the Kaleidoscope businesses.

I will keep an eye on it. It's still on my app map as of this morning.
 
I still don't see this site on the Find Us map. Could that be an indication it is temporary? I'm not sure why they wouldn't keep it here. It is a great location and will help the Kaleidoscope businesses.

I will keep an eye on it. It's still on my app map as of this morning.

The Find Us map is often one of the last things to get updated for a new Supercharger site, for some reason. So it might be a little early to conclude anything.

Bruce.
 
  • Like
Reactions: Falcon73
Nice find! I spent a few minutes trying to figure out if this was correlated to any site under construction (it appears not).

So these are of the "urban charger pallet" variety. I wonder if these are supposed to be permanent or temporary?

@MarcoRP @corywright @Chuq

Bruce.
I too hope they are permanent. Pallets are bolted to the pavement. Here are some pics of the conduit and load center:
20211225_153841.jpg


Additional note: preconditioned and was able to pull 71kw which I would expect from an urban charger (as opposed to some add-on style temp chargers that max out at 50kw).
 

Attachments

  • 20211225_153832.jpg
    20211225_153832.jpg
    287.8 KB · Views: 153
I had no idea these existed until I noticed this thread just now. Do they still exist? No reports on plugshare at all ...

The other MV mall urban superchargers are the closest to where I live, would be great to have a few more stalls as the first location can be quite busy.
 
Wow folks, Tesla has been sneaky about a massive upgrade to this site. It's on the floor above the one that's currently operational. The upgraded site is on level P1; it has 24 V3s plus another 20 destination chargers which is perfect for long stays at the mall. This is a very exciting development. I only came here to check out the the site because I was low on juice... I went to the wrong level and I discovered what was going on. This upgraded site looks like it's almost operational as well.

Someone I talked to said they'll be removing the urban chargers on P2 once the new ones are live but we'll see. Maybe the P2 ones were always meant to be temporary.
 

Attachments

  • IMG20230603161938.jpg
    IMG20230603161938.jpg
    263.3 KB · Views: 66
  • IMG20230603160726.jpg
    IMG20230603160726.jpg
    470.4 KB · Views: 75
  • IMG20230603160753.jpg
    IMG20230603160753.jpg
    342.8 KB · Views: 72
  • IMG20230603160500.jpg
    IMG20230603160500.jpg
    295.2 KB · Views: 70
  • IMG20230603160556.jpg
    IMG20230603160556.jpg
    363.9 KB · Views: 83
Last edited:
Still waiting. A quick count showed 22 destination chargers too. On level 2.
It’s confusing for folks that don’t know about the temporary chargers on Level 1.
I had to direct someone downstairs on my way out. He was getting ready to leave.
Tesla needs some signage here until they activate the SCs.

IMG_5919.jpeg
 
  • Like
Reactions: Falcon73
I will check again soon but it doesn't seem the level pictured above is live yet. It wasn't when I visited about 10 days ago and still no sign of life for the V3s on the app/car as of a few days ago. Still just the Urbans below this.

The caution tape is mostly down last I looked and the spots are being ICE'd but I can't blame them since they were down. I just hope they get the message when they go live.

I wonder what the hold-up is here?
 
I emailed Kaleidoscope again, but I confirmed they are waiting on SDG&E... I found where the transformer will go.

Also, I counted 20 L2s today (I thought I counted 22 previously), with 5 of them being J-1772s.

And to help ease my confusion, the new site is on P1 (Parking Level 1). The temporary site is on P2 (below P1). There's a P3 below even that, but it's roped off. Even P2 is scarcely used. And not to confusing things further, but there's another parking level above P1, called Main Level. Fun, huh?
 

Attachments

  • IMG20230829180007.jpg
    IMG20230829180007.jpg
    718.7 KB · Views: 53
  • IMG20230829180457.jpg
    IMG20230829180457.jpg
    601.5 KB · Views: 45
  • IMG20230829180605.jpg
    IMG20230829180605.jpg
    331.4 KB · Views: 50
  • IMG20230829174824.jpg
    IMG20230829174824.jpg
    357.8 KB · Views: 47
  • IMG20230829174835.jpg
    IMG20230829174835.jpg
    260.9 KB · Views: 61
  • IMG20230829181310.jpg
    IMG20230829181310.jpg
    264.3 KB · Views: 63