Tesla's Find Us map now has Rifle listed with a target date of Q2 2023.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
A welcome addition even with Parachute being open.Tesla's Find Us map now has Rifle listed with a target date of Q2 2023.
You would think that the service center would open there as well. I heard they scraped it thoughTesla's Find Us map now has Rifle listed with a target date of Q2 2023.
Did you hear that?! I’ve been scrounging for news on the service center. It’s suppose to open in Gypsum in a brand new industrial construction.You would think that the service center would open there as well. I heard they scraped it though
Im referring to the one in Gysum.Did you hear that?! I’ve been scrounging for news on the service center. It’s suppose to open in Gypsum in a brand new industrial construction.
That single charger is a thorn in my tail. It's at a point, I'll just go to Salida, UT and use Electrify America and charge enough to get to Beaver lolNow they just need to upgrade Richfield, UT...
Ya seriously, you know its bad when tesla owners have to use EA to fill the gap. I am sure tesla has the data for this being a pain point - its only a matter of time before its filled.That single charger is a thorn in my tail. It's at a point, I'll just go to Salida, UT and use Electrify America and charge enough to get to Beaver lol
Ya seriously, you know its bad when tesla owners have to use EA to fill the gap. I am sure tesla has the data for this being a pain point - its only a matter of time before its filled.
Depends on what is needed as far as site prep. If they are replacing one of the drive in areas with chargers they will most likely need to demo that first. If they have open parking areas that are being converted to chargers then that could be a short turnaround. Are there any markings indicating where the power is being trenched to?WOW! The Transformer is going in FIRST? That could mean the Supercharger Station could “possibly” be open in a couple of weeks!
I have been driving Teslas for 7 years and have watched the network grow over the past 10 years, and the rate of acceleration in station installations is very exciting, but I have also seen, bureaucratic nonsense drag out for months, and sometimes years, but this looks really good!
That large transformer is for Tesla. They would not have placed it there if that had to trench under a street to install the chargers. Sonic seems to be removing drive in stalls since customers favor drive thru (based on employee feedback on another SC install at a Sonic).Stopped by at the Sonic, and to my untrained eye, I see no progress on the construction of anything that resembles a Supercharger (at least to my untrained eye). The last picture is across the street in an open lot, could they possibly have decided to locate it there instead? The other side of the Sonic has no open parking, only drive in stalls that seem to be very much in use.