Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - State College/ Bellefonte, PA

This site may earn commission on affiliate links.

Attachments

  • 1E73B4DE-AD20-4E18-911E-3566E8F3705C.png
    1E73B4DE-AD20-4E18-911E-3566E8F3705C.png
    1,016.8 KB · Views: 175
I took photos and was going to post this evening. David beat me to it though.

I talked to workers last weekend and they said 6-8 weeks for west penn to come out.

I doubt it will be that long. They back filled all the trenches.

Looks to me like the utility transformer needs set yet and some lines painted, and finish putting the screening up. I didn’t look closely at the dc transformers to see if the wires were landed. I’m assuming they were.

The local inspector is usually pretty responsive and will most likely be able to come out a day or two after he is called.
 
The overnight options are great (we found the Country Inn & Suites to be great during our PSU visit), but the whole point of the Superchargers is to make the pit stop measurable in minutes, not days.

I'm really hoping they manage to get this one on the map by Thanksgiving... my alternate routes will mean trip legs that are 20-40 miles longer and multiple charges. If this opens, it splits my trip right down the middle and we should be in and out in about 30 minutes max.


DFRQnEgVwAA9TDB.jpg
 
  • Like
Reactions: RTPEV and sigmo32