You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
View attachment 574414 View attachment 574415 I stopped by today and counted 16 pedestal mounts (I couldn't get a picture of all of them in one picture). Looks like they've finished installing all of the conduit and there's three transformers on site still in their packaging.
Actually I think the bigger size suggests that maybe they intend to use it for service center use and still want some stalls left available to the public.Wow, 16 stalls?! Are there other service center locations with big superchargers? I thought service center locations were usually primarily for service center use, but 16 stalls suggests otherwise here...
Actually I think the bigger size suggests that maybe they intend to use it for service center use and still want some stalls left available to the public.
I can almost smell the wet cardboard from here.I stopped by this evening (8/31). They have 8 pedestals installed, still in black plastic wrap. Looks like they have a lot of equipment ready to be installed too so I bet by this weekend several more, possibly all, will be installed.
View attachment 583076 View attachment 583077 View attachment 583078
Those wall connectors have been there since before the Littleton Service Center's grand opening in 2017.I noticed that the Littleton SC/Delivery Center had recently installed destination chargers in the row between the two buildings. They are all marked for Authorized Vehicles Only. I had not seen those as of a month ago but I could be wrong.
Bonus pic of the DPD Tesla Model S.
View attachment 585869
To my newbie perspective this install seems to be moving at light speed.