Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Universal City, CA (under construction Dec 2023, 12 V3 stalls)

This site may earn commission on affiliate links.
Another addition to the valley. Posted by Marco in twitter, 12 stalls at Sheraton Parking lot- entrance to Universal Studios.
@bmah @Big Earl @Chuq
0D755C62-C47C-4687-9B45-8ABDA99652AA.jpeg
93165E6A-8D60-430C-8E69-CB47FAD3207C.jpeg
 
Construction already finished. Possible just waiting for transformer. Decided to go check on this site since details were added to the Find Us map for this location and other ones in construction, now says Driving Directions and Amenities. The actual Supercharger is in the front parking lot not in the back parking lot building. Apologies for the bad pictures, i took them from the car and fast, didnt want to look like the weird taking pics at night from a car.

@bmah @Guacahummus @Chuq
 

Attachments

  • IMG_1722.png
    IMG_1722.png
    458 KB · Views: 62
  • IMG_1723.jpeg
    IMG_1723.jpeg
    454 KB · Views: 59
  • IMG_1721.jpeg
    IMG_1721.jpeg
    430.3 KB · Views: 60
Went by today and as far as SC equipment, everything is fully installed. Stalls are bagged which means that we are in for a long wait. All seems to be “transformer wait”. Looks like LADWP is in the same bag as PG&E and SDGE.
 

Attachments

  • IMG_4199.jpeg
    IMG_4199.jpeg
    474.3 KB · Views: 34
  • IMG_4198.jpeg
    IMG_4198.jpeg
    830.5 KB · Views: 27
  • IMG_4196.jpeg
    IMG_4196.jpeg
    878.7 KB · Views: 29
  • IMG_4193.jpeg
    IMG_4193.jpeg
    674.2 KB · Views: 31