The crew came on 7am Wednesday and finished around 5pm Sat for system size of 15.3kw.
For the most part I'm happy with the installation process, however toward the end of Friday I felt like they were no longer being careful handling the panels like when the first started anymore.
I think the system worked fine today, generated 66.3kw for a partial cloudy day. I flew my mavic and found lot of panels scratches all over. Just wonder if anyone experienced the same issue with me
I attached some sample pictures.
For the most part I'm happy with the installation process, however toward the end of Friday I felt like they were no longer being careful handling the panels like when the first started anymore.
I think the system worked fine today, generated 66.3kw for a partial cloudy day. I flew my mavic and found lot of panels scratches all over. Just wonder if anyone experienced the same issue with me
I attached some sample pictures.
Attachments
-
9A6B6869-55EA-443A-B9FE-24C62480173D.png162.7 KB · Views: 95
-
83B1E446-25DA-4AC8-83ED-0B10A2D734F7.jpeg523.1 KB · Views: 72
-
4B942BE9-D49C-45F0-BAC3-D08244B97E5C.jpeg590.3 KB · Views: 61
-
6E2D6CF3-195F-4A3B-A260-FDC915257704.jpeg605.4 KB · Views: 70
-
590F2916-9897-42FE-B635-9C6454541218.jpeg593.8 KB · Views: 70
-
B4A43F40-72F5-4F3F-8166-8DDA9FAE3F02.jpeg554.6 KB · Views: 73
-
5445CE81-76BF-4021-B158-720477F7750C.jpeg477.3 KB · Views: 67