Considering that the site work is the last ~4 weeks of an installation, I don't think we'll see any physical work for at least another month. Additionally, it seems that the crews work from a starting point and then follow the network -- the WA SCs were worked on simultaneously, and those crews are now down in Oregon. So we may see work in CA on the Beaumont/Indio and Blythe ones before we see work here.
I'm just hoping site work is underway by Nov 1 -- we're planning a trip up to BC at Christmas and we'll make the decision on driving or flying in early Nov. In order to drive the Tesla, we will need SCs in at least Blythe and Beaumont, CA to get into the LA area, and then need another ~3 SCs added in NorCal and southern Oregon... We can reach Blythe from our house without needing to top off in Buckeye. But the elevation gain heading home will likely need a stop in Buckeye...