Hello,
Tesla is going to be doing a site visit next week. I have a 200A panel but all the slots were taken so I moved 4 circuits to tandem breakers in order to free up 2 slots for the solar install ; no powerwall. I have a center fed panel, so I'm assuming they will want to install the 2 pole breaker at the bottom of the panel? I made sure the 2 freed up slots are at the bottom of the panel. Its a 14 panel system (4.76KW) if that matters.
Also, while I'm doing this work, I'm debating installing a 100 A subpanel and moving two more circuits (EV charger and a GFCI circuit) over to the subpanel to free up some more room. Any reason I should hold off on this till after the solar install? Subpanel install should be pretty straightforward, but now I'm paranoid about Tesla complaining about something and asking for extra $$$ for electrical work.
Tesla is going to be doing a site visit next week. I have a 200A panel but all the slots were taken so I moved 4 circuits to tandem breakers in order to free up 2 slots for the solar install ; no powerwall. I have a center fed panel, so I'm assuming they will want to install the 2 pole breaker at the bottom of the panel? I made sure the 2 freed up slots are at the bottom of the panel. Its a 14 panel system (4.76KW) if that matters.
Also, while I'm doing this work, I'm debating installing a 100 A subpanel and moving two more circuits (EV charger and a GFCI circuit) over to the subpanel to free up some more room. Any reason I should hold off on this till after the solar install? Subpanel install should be pretty straightforward, but now I'm paranoid about Tesla complaining about something and asking for extra $$$ for electrical work.